Grand Cubic Dam MK II: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
Baba zombie (talk | contribs) mNo edit summary |
||
| Line 4: | Line 4: | ||
|built=[[User:ColDimitri|ColDimitri]] | |built=[[User:ColDimitri|ColDimitri]] | ||
|status=Unknown | |status=Unknown | ||
|world= | |world=New Avalon | ||
|province=? | |province=? | ||
|x=? | |x=? | ||
Latest revision as of 19:08, 18 October 2017
| Project Grand Cubic Dam Mk II | |
|---|---|
| Built by | |
| Current Status |
Unknown |
| World | |
| Province |
? |
| Location | (x=?,z=?) |
The Grand Cubic Dam Mk II is a project planned by ColDimitri, as a sequel to the original dam in Pixellia.
In comparison of the original Cubic Dam, ColDimitri plans for the new Dam to be 2 to 3 time bigger. The size is mainly depend on the amount of supplies Col can gather as well as the work force. The new Dam is aimed for a river that passes thru two cliffs. However due to Col's massive resource consuming fortress, the Dam is on hold for the time being. Though discussions with Fubaka may hold the future of the dam