'''Construction Timeline'''
'''Construction Timeline'''


7/20/12: First tower structure completed. (Tower of Courage)
7/20/12: SW tower structure completed. (Tower of Courage)


7/23/12: Second tower structure completed. (Tower of Night)
7/23/12: SE tower structure completed. (Tower of Night)


7/26/12: South wall completed.
7/26/12: South wall completed.
Line 37: Line 37:
11/12/12: SE Wall completed
11/12/12: SE Wall completed


12/16/12: Third tower structure completed. (Tower of Tides)
12/16/12: East tower structure completed. (Tower of Tides)


12/22/12: Fourth tower structure completed. (Tower of Mystery)
12/22/12: West tower structure completed. (Tower of Mystery)


<gallery>
<gallery>

Revision as of 23:36, 22 December 2012

Project
Castle Ood
Built by

Masternoj

Current Status

Construction Underway

World

[[New Avalon]]

Province

Uncharted

Location (x=1670,z=90)

[[category:New Avalon]]

The Castle Ood is an enormous hexagonal castle under construction by Masternoj in the wilds of Avalon.

At its widest point, the Castle Ood will stretch 440 blocks, not including the portions of the towers outside the walls.

The Castle Ood will be built mostly of stone brick, with high walls, crenellated towers at each corner, and will contain a large central keep, a throne room, and vast gardens.

At present, the land for the Castle Ood is completely levelled, and construction of the walls and towers is underway.

History

The initial idea for the Castle Ood was conceived in the fall of 2011, and was developed through a few months.

The site for the build was found in December of 2011, and terraforming has been ongoing since then.

Levelling was completed in mid-June 2012.

Construction Timeline

7/20/12: SW tower structure completed. (Tower of Courage)

7/23/12: SE tower structure completed. (Tower of Night)

7/26/12: South wall completed.

After a long absence:

11/12/12: SE Wall completed

12/16/12: East tower structure completed. (Tower of Tides)

12/22/12: West tower structure completed. (Tower of Mystery)

Contributors

The following people have helped substantially with the project thus far:

fishman12345

Twololcats

On3win9

BucketsAMF

digitamer1983

Paullessard

Shabbyjazz

runicrules

rubix124

chickenzdude

And special thanks to:

SunnySoulSheep, who has given the most assistance in terraforming, and dnolan1337, for donating 8 doublechests of stone/stonebrick for the walls and towers.