SubTerra Rail System: Difference between revisions

From Wikicubia
Jump to navigation Jump to search
Tomousee (talk | contribs)
No edit summary
mNo edit summary
 
Line 1: Line 1:
This Page is a Stub, it will be expanded at a later date.
This Page is a Stub, it will be expanded at a later date.


The SubTerra Rail System, is a Rail link Built by [[User: Ace_Card|Ace_card]] and [[User: Tomousee|Tomousee]] between [[Snowview]] and [[SubTerra]].
The SubTerra Rail System, is a Rail link Built by [[User: Ace_Card|Ace_card]], [[User: Peter_Smyth|Peter_Smyth]] and [[User: Tomousee|Tomousee]] between [[Snowview]] and [[SubTerra]].
* The rail itself was completed on the 6th of August 2011, and was powered, lit and operational by the 7th of August 2011.  
* The rail itself was completed on the 6th of August 2011, and was powered, lit and operational by the 7th of August 2011.  
* The rail is over 400 cubes long and took 3 days to build.
* The rail is over 400 meters long and took 3 days to build.

Latest revision as of 15:40, 3 January 2012

This Page is a Stub, it will be expanded at a later date.

The SubTerra Rail System, is a Rail link Built by Ace_card, Peter_Smyth and Tomousee between Snowview and SubTerra.

  • The rail itself was completed on the 6th of August 2011, and was powered, lit and operational by the 7th of August 2011.
  • The rail is over 400 meters long and took 3 days to build.