Grand Cubic Dam MK II: Difference between revisions

From Wikicubia
Jump to navigation Jump to search
mNo edit summary
mNo edit summary
Line 5: Line 5:
|status=Unknown
|status=Unknown
|world=[[New Avalon]]
|world=[[New Avalon]]
|province=?
|x=?
|x=?
|z=?
|z=?

Revision as of 04:37, 20 April 2012

Project
Grand Cubic Dam Mk II
Built by

ColDimitri

Current Status

Unknown

World

[[New Avalon]]

Province

?

Location (x=?,z=?)

[[category:New Avalon]]

The Grand Cubic Dam Mk II is a project planned by ColDimitri, as a sequel to the original dam in Pixellia.

In comparison of the original Cubic Dam, ColDimitri plans for the new Dam to be 2 to 3 time bigger. The size is mainly depend on the amount of supplies Col can gather as well as the work force. The new Dam is aimed for a river that passes thru two cliffs. However due to Col's massive resource consuming fortress, the Dam is on hold for the time being. Though discussions with Fubaka may hold the future of the dam