SubTerra Rail System

From Wikicubia
Revision as of 14:33, 12 August 2011 by Tomousee (talk | contribs)
Jump to navigation Jump to search

This Page is a Stub, it will be expanded at a later date.

The SubTerra Rail System, is a Rail link Built by Ace_card and Tomousee between Snowview and SubTerra.

  • The rail itself was completed on the 6th of August 2011, and was powered, lit and operational by the 7th of August 2011.
  • The rail is over 400 cubes long and took 3 days to build.