SubTerra Rail System
This Page is a Stub, it will be expanded at a later date.
The SubTerra Rail System, is a Rail link Built by Ace_card, Peter_Smyth and Tomousee between Snowview and SubTerra.
- The rail itself was completed on the 6th of August 2011, and was powered, lit and operational by the 7th of August 2011.
- The rail is over 400 meters long and took 3 days to build.