No edit summary
No edit summary
Line 108: Line 108:




'''[[User:SunnySoulSheep|SunnySoulSheep]]''' (most assistance in terraforming)
'''[[User:SunnySoulSheep|SunnySoulSheep]]''': Most assistance in terraforming.


'''[[User:dnolan1337|dnolan1337]]''' (donating 8 doublechests of stone/stonebrick for the walls and towers)
'''[[User:dnolan1337|dnolan1337]]''': Donating 8 doublechests of stone/stonebrick for the walls and towers.
 
'''[[User:Zolyx|Zolyx]]''': Painstakingly transferring the entire build to Voxellia with MCEdit.

Revision as of 03:04, 20 March 2014

Project
Castle Ood
Built by

Masternoj

Current Status

Construction Underway

World

[[Voxellia]]

Province

Uncharted

Location (x=-878,z=-2221)

[[category:Voxellia]]

The Castle Ood is an enormous hexagonal castle under construction by Masternoj in the wilds of Voxellia.

It was initially begun in the world of Avalon, and moved in its entirety to the new realm of Voxellia in early 2014.

At its widest point, the Castle Ood will stretch 440 blocks, not including the portions of the towers outside the walls.

The Castle Ood will be built mostly of stone brick, with high crenellated walls, elaborate towers at each corner, and will contain a large central keep, a throne room, and vast gardens.

At present, the land for the Castle Ood is completely leveled, and construction of the walls and towers is underway.

History

The initial idea for the Castle Ood was conceived in the fall of 2011, and was developed through a few months.

The site for the build was found in December of 2011, and terraforming was completed in mid-June 2012.


Construction Timeline

7/20/12: SW Tower structure completed. (Red- Tower of Courage)

7/23/12: SE Tower structure completed. (Black- Tower of Night)

7/26/12: South wall completed.

11/12/12: SE Wall completed

12/16/12: East Tower structure completed. (Blue- Tower of Time)

12/22/12: West Tower structure completed. (Purple- Tower of Mystery)

2/11/13: SW Wall completed.

2/23/13: Abrupt discharge from the not-so-benevolent CreeperHost, resulting in a rollback to 2/8/13.

4/8/13: SW Wall re-completed, with WE assistance from SunnySoulSheep.

4/26/13: NW Tower structure completed. (Green- Tower of Spirit)

10/27/13: NW Wall completed.

3/17/14: N Wall completed.

Contributors

The following people have helped substantially with the project thus far:


Leveling


fishman12345

Twololcats

On3win9

BucketsAMF

digitamer1983

Paullessard

Shabbyjazz

runicrules

rubix124

chickenzdude


Construction


runicrules

SunnySoulSheep

On3win9

Jarnakel


Special Thanks


SunnySoulSheep: Most assistance in terraforming.

dnolan1337: Donating 8 doublechests of stone/stonebrick for the walls and towers.

Zolyx: Painstakingly transferring the entire build to Voxellia with MCEdit.